Hyundai XG350 3.5 2003 cambelt change instructions and replacement inteval. Full guide!
Special tools
- None required.
Special precautions
- Disconnect battery earth lead.
- DO NOT turn crankshaft or camshaft when timing belt removed.
- Remove spark plugs to ease turning engine.
- Turn engine in normal direction of rotation (unless otherwise stated).
- DO NOT turn engine via camshaft or other sprockets.
- Observe all tightening torques.
Repair times – hrs
Camshaft drive belt/chain – R & I | 3,00 |
Camshaft drive belt/chain, AC – R & I | 3,40 |
Valve timing procedures
Removal
- Support engine.
- Remove:
- Engine cover.
- Auxiliary drive belt(s).
- PAS pump pulley.
- Guide pulley.
- Tensioner pulley.
- RH engine mounting bracket [1] .
- Crankshaft bolt [2] .
- Crankshaft pulley [3] .
- Timing belt upper cover [4] .
- Timing belt lower cover [5] .
- Turn crankshaft clockwise to TDC on No.1 cylinder. Ensure timing marks aligned [6] & [7] .
- Remove:
- Automatic tensioner unit bolts [8] .
- Automatic tensioner unit [9] .
- Timing belt.
NOTE: Mark direction of rotation on belt with chalk if belt is to be reused.
Installation
- Check tensioner body for leakage or damage [9] .
- Compress pushrod into tensioner body.
- Retain pushrod with suitable pin through hole in tensioner body [10] .
- Install automatic tensioner unit [9] . Tighten bolts to 20-27 Nm [8] .
- Fit timing belt in anti-clockwise direction, starting at crankshaft sprocket. Ensure belt is taut between sprockets.
- Remove pin from tensioner body to release pushrod [10] .
- Turn crankshaft slowly 2 turns clockwise to TDC on No.1 cylinder.
- Ensure timing marks aligned [6] & [7] .
- After 5 minutes check extended length of pushrod is 3,8-4,5 mm [11] .
- If not: Repeat installation procedure.
- Install components in reverse order of removal.
- Tighten crankshaft pulley bolt [2] . Tightening torque: 180-190 Nm.