F1CE348IN
Special tools
- Camshaft locking tool x 2 – No.0191-2B.
- Crankshaft pulley holding tool – No.0191-2K.
- Crankshaft timing pin – No.0191-2A.
- PAS pump sprocket locking tool – No.0191-2J.
General precautions
- Disconnect battery earth lead.
- Remove glow plugs to ease turning engine.
- Turn engine in normal direction of rotation (unless otherwise stated).
- Observe tightening torques.
- If fitted: Mark position of crankshaft position (CKP) sensor before removal.
- Do NOT turn crankshaft via camshaft or other sprockets.
- Do NOT turn crankshaft or camshaft with timing chain removed.
Valve timing procedures
Removal
- Removal/installation of timing chain requires:
- Engine removal.
- Install camshaft locking tools [1] .
- Turn crankshaft in direction of rotation until both camshaft locking tools engage.
- Remove crankshaft pulley.
- Install crankshaft timing pin [2] .
- Slacken idler sprocket bolt [3] .
- Remove:
- Secondary timing chain tensioner [4] .
- Primary timing chain tensioner [5] .
- Primary timing chain tensioner rail.
- Bolt of each camshaft sprocket.
- Camshaft sprockets.
- Secondary timing chain.
- Oil pump.
- PAS pump.
- Install PAS pump sprocket locking tool.
- Remove:
- PAS pump sprocket bolt [6] .
- PAS pump sprocket locking tool.
- PAS pump sprocket [7] .
- Primary timing chain guides.
- Primary timing chain.
Installation
- Ensure camshaft locking tools correctly fitted [1] .
- Ensure crankshaft timing pin correctly fitted [2] .
- Install:
- Primary timing chain.
- PAS pump sprocket [7] .
- Tighten bolt of PAS pump sprocket finger tight [6] .
- Ensure primary timing chain is taut between sprockets on non-tensioned side.
- Install:
- Primary timing chain guides.
- Secondary timing chain.
- Camshaft sprockets.
- Tighten bolt of each camshaft sprocket finger tight.
- Ensure secondary timing chain is taut between sprockets on non-tensioned side.
- Install PAS pump sprocket locking tool.
- Tighten bolt of PAS pump sprocket. Tightening torque: 130 Nm.
- Remove PAS pump sprocket locking tool.
- Install:
- Primary timing chain tensioner rail.
- Primary timing chain tensioner [5] . Tightening torque: 50 Nm.
- Oil pump.
- New secondary timing chain tensioner [4] .
- Tighten bolt of each camshaft sprocket. Tightening torque: 110 Nm.
- Tighten idler sprocket bolt [3] . Tightening torque: 110 Nm.
- Remove:
- Crankshaft timing pin [2] .
- Camshaft locking tools [1] .
- Turn crankshaft four turns clockwise.
- Ensure crankshaft timing pin and camshaft locking tools can be fitted [1] & [2] .
- Tighten crankshaft pulley bolt. Tightening torque: 350 Nm.