Hyundai Tucson 2.7 2005 cambelt change instructions and replacement inteval. Full guide!
Special tools
- None required.
Special precautions
- Disconnect battery earth lead.
- DO NOT turn crankshaft or camshaft when timing belt removed.
- Remove spark plugs to ease turning engine.
- Turn engine in normal direction of rotation (unless otherwise stated).
- DO NOT turn engine via camshaft or other sprockets.
- Observe all tightening torques.
Repair times – hrs
Camshaft drive belt/chain – R & I | 2,60 |
Camshaft drive belt/chain, AC – R & I | 2,80 |
Valve timing procedures
Removal
- Raise and support front of vehicle.
- Remove:
- Engine cover.
- RH front wheel.
- RH inner wing access panel.
- Turn crankshaft clockwise to setting position.
- Ensure crankshaft pulley timing marks aligned [1] .
- Remove:
- Auxiliary drive belt(s).
- Auxiliary drive belt tensioner.
- Support engine.
- Remove:
- RH engine mounting intermediate bracket bolts [2] .
- RH engine mounting intermediate bracket nuts [3] .
- RH engine mounting intermediate bracket [4] .
- PAS pump.
- Timing belt upper cover [5] .
- Crankshaft pulley bolt [6] .
- Crankshaft pulley [7] .
- Auxiliary drive belt guide pulley.
- Timing belt lower cover [8] .
- RH engine mounting bracket bolts [9] & [10] .
- RH engine mounting bracket [11] .
- Ensure timing marks on camshaft sprockets aligned [12] . If not: Turn crankshaft one turn clockwise.
- Ensure crankshaft sprocket timing marks aligned [13] .
- Remove:
- Automatic tensioner unit bolts [14] .
- Automatic tensioner unit [15] .
- Timing belt.
NOTE: Mark direction of rotation on belt with chalk if belt is to be reused.
Installation
- Check tensioner body for leakage or damage [15] .
- Compress pushrod into tensioner body.
- Retain pushrod with suitable pin through hole in tensioner body [16] .
- Install automatic tensioner unit [15] . Tighten bolts to 20-27 Nm [14] .
- Ensure timing marks aligned [12] & [13] .
- Fit timing belt in anti-clockwise direction, starting at crankshaft sprocket. Ensure belt is taut between sprockets.
- Remove pin from tensioner body.
- Turn crankshaft slowly 2 turns clockwise.
- Ensure timing marks aligned [12] & [13] .
- After 5 minutes check extended length of pushrod is 7-9 mm [17] .
- If not: Repeat installation procedure.
- Install components in reverse order of removal.
- Tighten auxiliary drive belt guide pulley bolt. Tightening torque: 35-55 Nm.
- Tighten crankshaft pulley bolt [6] . Tightening torque: 180-190 Nm.
- Tighten RH engine mounting bracket bolts [9] . Tightening torque: 60-70 Nm.
- Tighten RH engine mounting bracket bolt [10] . Tightening torque: 15-22 Nm.
- Tighten RH engine mounting intermediate bracket nuts and bolts [2] & [3] . Tightening torque: 60-80 Nm.